Project:
Optimization of waste separation at construction sites
We at Stam+ de Koning Bouw would like to reduce and separate waste. However, we often encounter the issue that there is not enough space on the construction site, resulting in a large amount of waste going into the residual waste container. This makes it more difficult to recycle the waste.
Help request
We want to gain more knowledge about how to best tackle waste separation on construction sites with space constraints.
Initial Tasks
1.
to be determined
Impact on
Fossil-Free
Average
Circular
Huge
Adaptive
Average
Start
2023-11-13
2030-12-31
End
Phase
Organisations
Initiator
Interested
Residents involved?
No